Planning A Bathroom Remodel? Read This Before You Tile.
Most problems with shower glass start long before the glass arrives. Six things to settle with your contractor while the walls are still open.

Six things to settle early.
Share this page with your contractor. We work with homeowners and contractors, on remodels and new construction.
Call the glass installer early
Bring us in while the plans are still on paper, before final tile and curb decisions. The glass is the last thing installed, but the layout of the glass depends on choices made at the very start: where the valve goes, how high the curb is, where the niche sits.
Get the curb and slope right
The curb is the low wall the glass stands on. Its top should slope slightly back toward the shower so water runs in, not out onto the bathroom floor. A curb that is too narrow, or sloped the wrong way, makes it hard to seal the glass well.
Add blocking in the walls
How hinges are heldHinges screw into the wall. Solid wood behind the tile where they go is preferred, though today’s hinges hold fine without it. If you want it, tell your contractor before the walls are closed up. Adding it later means taking tile off.
Plan the niche and bench around the door
See the 90° corner layoutA frameless door swings out over the room and needs clear space to open. Keep niches, benches and grab bars out of the path of the door and away from where hinges or clamps will sit. On a corner shower, the door usually hinges off the wall nearest the mixing valve, so that is a good place to start the plan.
Check the ceiling height for steam
See steam enclosuresA steam shower’s glass runs floor to ceiling to hold the steam in, and the ceiling has to be fully tiled. Settle the ceiling height and finish before the tile goes up, and plan where the operable transom will sit.
Measure only after the tile is done
Frameless glass is cut to fit the opening exactly, so we measure for final once the tile is finished and grouted. Measuring off bare walls or backer board leads to glass that doesn’t fit. We can still see the plans early and give you a price before then.
Send us your plans before you tile.
Use the pricing form and choose Custom layout. Add a photo of the drawings, a sketch or the space as it is now, and say where you are in the remodel. We reply the same day.
Send us your plans
More guides from the installer.
- Glass & hardware guideEvery glass and hardware choice in one place, in plain terms.
- Clear vs. low-iron glassWhy standard glass looks green on the edges, and when low-iron is worth it.
- Handles & finishesThe included Oceana pull, the upgrade handles, and every finish with a real swatch.
- What to watch out forCommon shower glass problems, and how to check for each one.
- Wall-mount vs. pivot hingesDo wall-mount hinges fail? What each kind is rated for, and what to ask.

Showcase Shower Doors & More15+ years in the trade
Remodel underway? Talk to the installer before the tile goes up.
Call or text us with questions about layouts, glass or timing. No sales pitch, just the team that would measure and install it.